Engineering Studies

Open-Pit Mine Haulage Electrification Study – Trolley Assist and Flying Belt

Assessment of haulage electrification options to reduce energy use and emissions while maintaining production continuity and the haulage capacity required by the mine plan.

Demonstrated Capabilities
Trade-off Studies Open-Pit Mining Equipment Selection Life-of-Mine (LOM) Planning Optimization
Project Overview

An Integrated Approach to Mine Haulage Electrification

Selecting an electrified haulage system calls for a combined assessment of productivity, infrastructure, equipment requirements, power demand, capital investment, and operating costs.

The study compared haulage configurations and established a technical and economic basis for selecting the most suitable option for the operation.

Open-pit mining operation assessed for haulage electrification
Mine Haulage Electrification Operational, Energy, and Economic Assessment
Case Study

Challenge, Scope, and Value Delivered

01

Challenge

The operation needed to assess options for reducing haulage energy consumption and associated emissions without compromising production continuity or the material movement capacity defined in the long-term mine plan.

02

Scope

The study compared conventional truck haulage, trolley-assist systems, and complementary options such as Flying Belt. The assessment covered operating performance, infrastructure requirements, equipment selection, compatibility with the mine design, energy efficiency, and techno-economic evaluation.

03

Value Delivered

The study established objective criteria for selecting an electrified haulage option suited to site conditions, balancing productivity, capital investment, operating costs, and emissions reduction.

✓

A Sound Basis for Decision-Making

The assessment provided a consistent comparison of haulage alternatives, considering technical feasibility, integration with the mine plan, and trade-offs among productivity, capital investment, operating costs, and emissions reduction.

Buscar